RFQ Checklist
- Share tube drawing, pattern drawing, and critical tolerance notes
- Confirm material grade, OD, ID, wall thickness, and length
- Define surface finish, electropolish/passivation needs, and burr limits
- State prototype quantity, pilot quantity, annual forecast, and destination

